• Movable Partition
  • Acoustic Diffuers
  • Noise Barrier
  • Acoustic Panels
Home  /  Projects

Gymnasium Acoustic Project

  • Gymnasium Acoustic Project
  • Gymnasium Acoustic Project
  • Gymnasium Acoustic Project
  • Gymnasium Acoustic Project
  • Gymnasium Acoustic Project
  • Gymnasium Acoustic Project
  • Gymnasium Acoustic Project
  • Gymnasium Acoustic Project
  • Gymnasium Acoustic Project
  • Gymnasium Acoustic Project
  • Gymnasium Acoustic Project
  • Gymnasium Acoustic Project

The gymnasium is a comprehensive gymnasium with the characteristics of the new era and high standards. In addition to meeting the requirements of various sports competitions , gymnasium often need to meet the requirements of multi-functional applications, such as meeting report and artistic performance which saves the construction cost, the operation cost. There are more than 300 square meters of glass Windows on the walls in the gymnasium , which cannot be acoustical treatment, and is easy to form echo, quivering echo and sound focusing. In order to obtain a short reverberation time inside the museum, the decoration materials with relatively high sound-absorbing performance requirements are usded in the limited space.


  1. Design, Construction and material manufacture: By Guangdong Liyin Acoustics Technology Co., Ltd

  2. Area Coverage:1800m ㎡ 

  3. Function:sport, performance and reporting 

  4. Reverberation time:1.4±0.1s


Liyin Acoustics is dedicated to the empty space of the indoor space of the sports venue, and specially focused on the sound reverberation duration of the stadium during the acoustic design process. Through the use of professional acoustic diffusion design, the full-frequency space sound-absorbing body is suspended at high altitude. The appearance of sound and shadow areas is avoided; the wall part adopts sound absorption and sound insulation to ensure a uniform acoustic environment from the center to the boundary of the stadium, so that the spatial reverberation time of the entire sports stadium reaches the acoustic standard of the country's top sports stadiums. On the premise of meeting acoustic standards, Liyin Acoustics' construction team fulfilled the promise of design effect as completion effect through professional construction and installation technology. The venue has now been inspected and put into use.


We are a one-stop acoustics factory with 14 years experiences on research and development, manufacturing, professional acoustics analyse with calculation, 3D visual design and oversea construction.


Choosing Leeyin Acoustics will give you the most practical and effective Gymnasium acoustic solution.


Contact Us
  • Tel: +86 18620957845
  • E-mail: leeyin@gzliyin.com
  • Wechat: +86 18620957845
  • Whatsapp: +86 15919190386
  • Add.: Rm. 401, LiBao Building, No.277 Baogang Rd., HaiZhu District, Guangzhou City, Guangdong Province, China
Require Free Quote & Catalog